Tuesday, 22 February 2022

Madikeri Rural Distribution Reorg

 Chamundeshwari  Electricity Distribution Company  is the Distribution Licensee for managing  KODAGU District with five Taluks managed by one O&M  Subdivision in each taluk.

  Madikeri Taluk comprises of Madikeri CMC with 35000 population attached with  67 villages spread over  four hoblis i)Madikeri ii) Sampaje iii) Bhagamandala iv) Napoklu with population of 1,20,000. Madikeri CMC area is catered power by Five urban & One water works feeders connected to  309 DTCs (21800 kva) and managed by One urban unit( AE) and the Villages of Madikeri Hobli on periphery of City with 272 distribution transformer centres of 11683 KVA is managed  by One Section OFFICER( JE).

 To facilitate smooth maintenance and to take care of future improvement works, proposals are being sent by AEE Madikeri for bifurcation of present O&M -2 and to form an new O&M-3 unit at Makkandur ( on Madikeri - Somwarpet Road) and redistribute work load and maintenance equally. CESC Distribution Engineers have been  requested to  consider   release of the loads of this O&M-2 rural loads  connected to lengthy feeders of Bhagamandala (F6)-39 tcs 1656 kva and Sampaje(F8) 45 tcs 1993 kva among the  neighbouring short lightly loaded feeders of Mekeri F3 and Galibeedu F11.  

Transfer of Madikeri O&M-2 rural loads to Galibeedu or Mekeri feeder  will provide relief to tail end consumers of Melchembu (SAMPAJE HOBLI)  and Talakaveri (BHAGAMANDLA HOBLI) presently fed over lengthy feeders of 60 + kms . Madikeri Taluk rural area is at present fed by Ten   feeders ( Ten) ,Five  from Madikeri and Five  from MURNAD. With commissioning of new 66/11 kv Substation at SAMPAJE and Bhagamandala, 10 more 11KV feeders will be added to KODAGU system to feed Madikeri Taluk rural areas.

Sunday, 20 February 2022

MADIKERI RURAL Electrical network .

 

Electric Power  to Bhagamandala / SAMPAJE/ Napoklu/ MADIKERI Hobli :

 

Electricity consumers of Madikeri Rural areas with feeding from MURNAD substation & F6 & F8 feeders of Madikeri substation  are experiencing acute low voltage and frequent interruptions in the present system.   66/11KV substation established at Sampigekatte RF on the outskirts of Madikeri feeds   Sampaje/ Bhagamandla / Mekeri    feeders with  idle  run in the same  alignment for 5.0 Kms,  one circuit with "Aerially bunched insulated conductors" and two   circuits with weasel conductors from New Madikeri 66/11 KV substation   to Sudarshan circle  ( along NH-275-Mysuru Mangalore Road). DTC break up on each of these feeders are as as follows: 


1)    Sampaje Hobli :Sampaje & Chembu Village Panchayath area  Power supply is   arranged from Madikeri 66/11 KV substation through 11 KV feeder -F8(Code 5117): Peak load-1.4Mws, Energy sent out : 44.532 Lakhs. DTc’s connected : 116nos- 4904 Kva+ Export to  37 Tcs /1682 KVA [ MESCOM] . Energy loss: 24%. VR ar tail end: 30%. 71 TC's - 2911KVA in Sampaje & Chembu Villages & 45TCs-1993 KVA of Madikeri O&M-2 (of Katakeri/ Madenadu / Bettathur / Monnangeri-2 villages )     are connected to lengthy feeder of F8. Need to bifurcate these   loads of spur lines   and consider forming a seperate circuit and connecting to neighbouring Galibeedu feeder (F11-Code 5119)  which caters power to  35 Tcs -1480 kva of Madikeri Hobli Galibeedu, Hebbatageri; Kalakeri Nidugane, Kalooru villages.     To consider linking Koyanad Sampaje ( TC:511739) with  Urubylu Chembu village and arrange reconductoring of conductor from Chittekana(Koyanad Sampaje )  to Chembu -weasel by Rabbit ACSR to improve power to Chembu Village.  


2)  Bhagamandla Hobli: Large number of villages in Brahmagiri hill ranges are part of this hobli. Power is now arranged from 11 KV feeder of Madikeri substation by  -F6-Code 5115, DTC’s:144, 5758 KVA. Out of these 39tc’s (1656 kva) are maintained by Madikeri Rural ( Appangala, Bettageri & other near by villages to Madikeri). 4 tcs (176 kva) of Napoklu hobli  are connected to this feeder. Power requirement of KARIKE VILLAGE, which has   31 DTC'S WITH 1144 KVA is now arranged by interstate supply  from KSEB ( Thondammal 33 /11 substation ) and suffer low voltage. 1000 kva Voltage Regulator is installed. (BPCL Hydel  IPP of 2*5.5 mws is located at Karike and  connected to Sullia muss by 33 kv line and evacuates power from June to November [ 35,000 mwh of energy per annum } to Dakshina Kannada  MESCOM Grid. 

  

3) Napoklu Hobli: Villages located on Kaveri river and bound by hill ranges of Thadiyandamol- Brahmagiri ranges up to Ballamavati-Nelaji to Yavakapadi/ Chelavara/ Kunjila are part of this hobli. State Highway SH90 connecting Hunsur- Virajpet with Bhagamandala & Talakaveri passes through this hobli. Area is now   fed from  Napoklu & Hoddur 11KV feeders of Murnad 33/11 KV 5 Mva substation with peak load of 2.4 Mws in each feeder. Improvements to distribution system   by rearranging & reconductoring feeders along with upgradation of Murnad substation from 33KV to 66KV is under process.  At present load shedding is resorted by CHESCOM to restrict system peak to station 5 MVA Power transformer. 


4)    Madikeri Hobli: Madikeri CMC area is fed  by Five Town feeders(301 nos dtc's of 21.00 MVA capacity) & One exclusive water works feeder & Rural areas on Galibeedu, Madapura,  Suntikoppa(NH275), Siddapura( SH89) Murnad  Roads are fed by 11KV   feeders of Madikeri Station [ Galibeedu/ Boikeri/ Mekeri]  & Two feeders of Murnad station ( Maragodu & Murnad).    Boikeri ( 69tc’s- 2862 KVA), MEKERI feeder(84 dtcs- 3692 kva) & Galibeedu feeder with 35 dtc's(1480 kva)   need to be bifurcated and feeder loads rearranged. Forming of  KADAGADAL new feeder (2000KVA) making use of  additional   11 Kv breakers at KPTCL 66/11 KV substation at Madikeri    This new feeder will facilitate to ease constraints in  MARAGODU feeder fed  from   Murnad 33/11 KV station.  Katakeri & Madenadu villages will have better power with tapping from Galibeedu feeder.


     With the all round developments around Kodagu, smart city in Mangalore & faster connectivity between Mysore & Bangalore, urban planners have forecast urban development and demand for additional Power in MADIKERI CMC area and rural areas of all the four hoblis Napoklu/ Sampaje/ Bhagamandala /  Madikeri   Hobli.


      Madikeri( Kodagu District Hqs) needs a additional  WEST SIDE station to take care of Sampaje ( Residual), Bhagamandala ( Residual) Mekeri & Galibeedu feeder loads & to provide stand by alternate supply to Water works & Urban feeders of Western side of MADIKERI Town around Raja Seat / TV station/ KSTDC/ FMC College satellite development

 

 

 

 

 

Thursday, 17 February 2022

ತುಳುನಾಡ ಸೊಲ್ಮೆಲು : ಸುರುದ ಬರಸ

 

ಪನಿ ಪನಿ ಬರಸ ಸುರು ಸುರುದಾ ಪನಿ /

ಜಾರುಂಡು ಭೂಮಿಗ್ ಮುತ್ತುದಾ ಪನಿ ಬರಸ //

ಜಾಲುಡ್ ರಂಗೋಲಿ ಮೆತ್ತೊಂದು ಉಂಡಗೆ/

ಮಲ್ಲಿಗೆ ಸೇವಂತಿಗೆ ಕೇದಾಳಿಗೆ ,ಸಂಪಿಗೆ ದೇವರ್ನ ಪೂಜೆಗೆಂದು ಕಾತ್ತೊಂದು ಉಂಡುಗೆ/

ಮಲ್ಲಿಗೆ ಚೆಂಡಾನ್ಡ್ಗೆ ಮದುಮಾಳು ಸಿಂಗಾರಗೆ

Wednesday, 16 February 2022

ಆಧುನಿಕ ಯುಗದಲ್ಲಿ ಆರೋಗ್ಯ ರಕ್ಷಣೆ-

        ಆಧುನಿಕ ಯುಗದಲ್ಲಿ ಆರೋಗ್ಯ ರಕ್ಷಣೆ- ಮನು ಜೀವಿ ಇಂದು ಸುಖಿಯೆ?

ಬಹು ರಾಷ್ಟ್ರೀಯ ಕಂಪನಿಗಳು ಆರೋಗ್ಯ ವಿಮೆ ಕ್ಷೇತ್ರದಲ್ಲಿ ಬಂಡವಾಳ ಹೂಡಿವೆ.
ವೈದ್ಯಕೀಯ ತಪಾಸಣೆ ರಕ್ತ ಪರೀಕ್ಷೆಗಳಿಗೆ ಹವಾ ನಿಯಂತ್ರಿತ ಪ್ರಯೋಗಾಲಯಗಳು ತಲೆ ಎತ್ತುತ್ತಿವೆ.
ಯೋಗ, ಸತ್ಸಂಗ, ಉತ್ತಮ ಆಹಾರ ಹಾಗೂ ಜೀವನ ಕ್ರಮಗಳ ಬಗ್ಗೆ ಅನುಭವಾಮೃತಗಳ ಭೋದನೆ
ಒಂದೆಡೆಯಾದರೆ ವಿರುದ್ಧ ದಿಕ್ಕಿನಲ್ಲಿ ಚಲಿಸಲು ಆಕರ್ಷಣೆಗಳು ಇನ್ನೊಂದೆಡೆ.
ಕೆಲಸದ ಒತ್ತಡ, ಮೂಲಭೂತ ಸೌಕರ್ಯಗಳಿಗೆ ಸಮಯ ವ್ಯಯ.
ವೈದ್ಯಕೀಯ ಕ್ಷೇತ್ರದ ಆವಿಷ್ಕಾರಗಳ ನಡುವೆಯೂ ಜನ ಸಾಮಾನ್ಯನ ಆರೋಗ್ಯ ಸುಧಾರಣೆಯಾಗಿಲ್ಲ.
ಪ್ರತಿ ಕುಟುಂಬವೂ ಅವರ ಜೀವನದ ಉಳಿತಾಯವನ್ನೆಲ್ಲಾ ತಪಾಸಣೆ ,
ವಿಮೆ, ಚಿಕಿತ್ಸೆ, ಶುಶ್ರೂಷೆಗಾಗಿ ವ್ಯಯಿಸುವ ಪರಿಸ್ಥಿತಿ ನಿರ್ಮಾಣವಾಗಿದೆ.
 

Sunday, 13 February 2022

RESOURCES MOBILISATION

 ಸಂಪನ್ಮೂಲ :

ಚಿಂತನಶಕ್ತಿ ಹೆಚ್ಚತ ರಾಜಕೀಯ ಪ್ರಜ್ಞಾ ಮೂಡುತಿದೆ .
ಭಾರತ ಶಾಂತಿಯುತ ಸೌಹಾರ್ದ ಜೀವನ ಬಯಸುತ್ತಿದೆ .
ಶಾಸನ ಸಭೆ, ಲೋಕ ಸಭೆಯ ತಯಾರಿಯಲ್ಲಿದೆ ಸಂಘಟಿತ ಶಕ್ತಿಗಳು.
ರೈತ ಶಕ್ತಿ , ಸ್ತ್ರೀ ಶಕ್ತಿ, ಯುವ ಶಕ್ತಿ , ಧರ್ಮದ ಪ್ರಾಮುಖ್ಯತೆಯಲಿ .
ಸಂಪನ್ಮೂಲಗಳ ಕ್ರೋಡೀಕರಣ ವ್ಯವಸ್ಥಿತ ಸದ್ಬಳಕೆಯಲಿ.
ಕೌಶಲ್ಯಾಭಿವೃದ್ಧಿ, ಸ್ವತಂತ್ರ ಸ್ವಾವಲಂಬನೆಯತ್ತ ನೋಡುತಲಿ .
ಗ್ರಾಮೀಣ ಸಂಘಟಿತ ಯುವಪೀಳಿಗೆ ಮುಂದಡಿಯಿಡುತ ಹೊಸತನದಿ
ಯೋಗ ಶಿಕ್ಷಣ, ಆರೋಗ್ಯ, ಸಾಮಾಜಿಕ ಜ್ಞಾನದ ಅರಿವಿನಲಿ .
ಉಳುವವಗೆ ಭೂಮಿಯ ಹಕ್ಕು, ಭೂಸುದಾರಣ ಕಾನೂನು,
ನಲಿ ಕಲಿ ಉಚಿತ ವಿದ್ಯಾದಾನ ಸಮಗ್ರ ಸಾಕ್ಷರತೆಯಲಿ .
ತಾಂತ್ರಿಕತೆ ಜಾಗತೀಕರಣದಲಿ ರಾಷ್ಟ್ರಗಳು ಒಟ್ಟುಗೂಡುತಿವೆ
ಅಂತರ್ಜಾಲದಿ, ಹೊಸ ಭರವಸೆಯ ಬೆಳಕ ಸೃಷ್ಟಿಯಲಿ .
ಜೀವನ ಕ್ರಮದ ಸುಧಾರಣೆಗೆ ತಂತ್ರ ಜ್ಞಾನವ ಬಳಸುತಲಿ
ಸೂರ್ಯ ಶಕ್ತಿ , ಸುಧಾರಿತ ನೀರಿನ ಶುದ್ದೀಕರಣ ಬಳಕೆಯಲಿ
ಸಾಕ್ಷರತೆಯ ಉಳುಮೆ ತರಲಿದೆ ಹೊಸ ಜಗತ್ತಿನಲಿ ಬದಲಾವಣೆ .
ಮನುಕುಲ ಹುಡುಕುತಿದೆ ಹೊಸ ಗ್ರಹದ ಅನ್ವೇಷಣೆಯಲ್ಲಿ

Friday, 11 February 2022

ಕರುಳ ಋಣ - ಮಡಿಲ ಕಾರುಣ್ಯ

 ಕರುಳ ಋಣ - ಮಡಿಲ  ಕಾರುಣ್ಯ 

ವಾನಪ್ರಸ್ಥದ ಅಂಚಿನಲ್ಲಿ ನಿಂತಿಹ ನಮಗೆ ಇಂದು ಅದರ ಅನುಭವ ವಾಗುತಿದೆ. .
ಎಂಟು ದಶಕಗಳು ಕಳೆಯುತ್ತಾ ಬಂದರೂ ವಾಸ್ತವತೆಯ  ಒಪ್ಪಲಾರದ ಒಳ ಮನಸ್ಸು  
ಹೆತ್ತವರ ನಂಬಿದ ಆಪ್ತರ ಕಳೆದು ನಗರದಲ್ಲಿ ದೂರದಿ ಅಣು ಕುಟುಂಬ ಜೀವಿಸುತ್ತಿರುವ ಎಮಗೆ. 
ಸಾಂಕ್ರಾಮಿಕ  ವೈರಾಣುವಿನ  ವಿವಿಧ ರೂಪಾಂತರಗಳು   ಧರ್ಮ ಪರೀಕ್ಷೆಗೆ ಈಡು ಮಾಡಿತು. 
 
ಅತ್ತ  ಋಣದ  ರಿಣ ಊರಿನೆಡೆಗೆ ಸೆಳೆಯಿತು ಸಪ್ತ ಸಾಗರ ದಾಟಿ ಮೋಹದ ಮಾಯೆಯಲಿ 
ಯಾವುದು ಋಣ ಯಾವುದು ಈ ರಿಣ ಎಂಬುದನ್ನು ಪ್ರಶ್ನಿಸುತ್ತಿದೆ ಈ ಮಾಯಾ ಲೋಕ. 
ಡಿಸೆಂಬರ್ ೨೦೨೨ ಹೊಸ ಅನುಭವದ ಹೊಸ ಸಂಬಂದದ ಪರಿಚಯಿಸಿತು 
ಆಪ್ತರನ್ನು ಕಳೆದು ಕೊಳ್ಳುತ್ತಾ ಹೊಸಬರನ್ನು ಒಳ ಮಾಡಿಕೊಳ್ಳುತ್ತ  ರಿಣದ ಕೊಂಡಿಯ  ಹೊಸ ರೂಪ.   

ನವ ಯುಗದ ನವೋಲ್ಲಾಸದ ಸಾಂಸ್ಕೃತಿಕ ಪರಂಪರೆಯ  ಅಮರ ಕೀರ್ತಿಯ ನಾಡಲಿ ಸ್ವಾಗತಿಸುತ 
ವಿಜ್ಞಾನ  ಆವಿಷ್ಕಾರ ಇಂಧನಗಳ ರೂಪಾಂತರ ಸದ್ಬಳಕೆಯಾ ಕ್ರೋಡೀಕರಣದಲಿ 
ಸಾಮಾನ್ಯ ಜನರ ಜನ ಜೀವನ ಕ್ರಮ ಸುಧಾರಣೆ ಯಾಗುತ್ತಿದೆ ಹೊಸತನದಿ 
ಸಂಪನ್ಮೂಲ ಅಭಿವೃದ್ಧಿ  ಅಗತ್ಯತೆ ಗಳ  ನಡುವಿನ ಅಂತರವ ಕಡಿಮೆ ಮಾಡುತ್ತಾ ಸದ್ಬಳಕೆಯಲಿ. 

ಹೆತ್ತವರು ಸಾಕಿದವರು ರೂಪಿಸಿದವರು ತಿದ್ದಿ ತೀಡಿದ ಗುರುಗಳು ಆಪ್ತರು ಸ್ನೇಹಿತರ ನಡುವಿನಲ್ಲಿ 
ಶೈಶವ ದಿಂದ  ಯೌವನ ಪ್ರೌಢ ಗೃಹಸ್ಥಾಶ್ರಮ ವಾನಪ್ರಸ್ಥದ ವರೆಗಿನ  ಏರು ಪೇರುಗಳ  ಈ ಪಯಣದಿ 
ದಿನಚರಿಯ ಪುನರ್  ಅವಲೋಕಿಸುತಲಿ ಸವಿ ನೆನಪುಗಳ ಮೆಲುಕು ಹಾಕುತ್ತಾ   ಬಾಳಿನಂಚಿನಲಿ 
ಕೊನೆಯ ಅಧ್ಯಾಯವ ಹೊಸ  ಚಿಂತನೆಯಲಿ ಋಣದ ರಿಣದ  ಖಾತೆಯನ್ನು ಅವಲೋಕಿಸುತಲಿ 

ಕೀ ಬಾ ರ 

Tuesday, 8 February 2022

Infrastructure- the game changer.

 Infrastructure now planned to connect rural India with urban centres is planned in a big way in the present budget 2022 indicating the capital works under different sectors for different States. Along with regular allocation for Defence, Security, Food & Civil supplies, Agriculture production  major financial out lay is provided for "Logistics" by Air/ Sea/ Rail & Roads/water ways  bringing Indian rural parts closer with urban culture and facilities by interlinking major Rivers of North India with Southern India.

India is surrounded by sea on three sides, with larger portion of desserts in  few states of North. Himalayan mountain ranges on the Northern boundary. Along with Rail Road, Planned national networks of Highways are being planned to interconnect all Taluks with respective State capitals and Inter States. 786 KV/ 400 KV EHV transmission line networks are being drawn across  all states forming One single National Power Grid with  Region & State load despatch centres for real time load monitoring & load management. As on date major portion of power generation in India is by Thermal ( Coal as fuel). Gradually generation by Solar & Wind is increasing reducing the use of fossil fuels & carbon emission. 

Extension of transmission lines and proposed new substations  in all the Five taluks of Kodagu are part of the above plans to support the extended HT distribution lines under "RDSS" in KODAGU. 

Annual Plan of works for 2021-22:

Augmentation of Power Transformers in existing substations:

i) Ponnampet 12.5 MVA ii) Kushalnagar 12.5 MVA, iii) Suntikoppa:12.5 MVA

Exclusive Transmission link line:

i) Madikeri to Virajpet 66KV transmission line s/c in D/c towers for 37.5 KMS. 

New Substations:  i) Hudikeri ii) Upgradation of 33/11 KV SRIMANGALA iii) Hangal Shetty Halli 66/11 & 66/33 to facilitate SOMWARPET 33/11 KV. iv) Upgradation of  33/11 KV MURNAD to 66/11 KV 1*8 MVA. 

Annual Plan for 2022-23: It is in draft stage and  will be approved and published for plan of action by KPTCL Transmission Zones by  after approval  by Government & BOARD.